dwc:measurementDeterminedDate
From TDWG Terms Wiki
Revision as of 16:42, 5 March 2020 by Terms Upload Bot (Talk | contribs) (→top: added outdated warning with link to up-to-date information)
Warning: This is not the current version of this document. It is kept for archival purposes. For up-to-date information, go to https://dwc.tdwg.org/terms/#dwc:measurementDeterminedDateMeasurement Determined Date: The date on which the MeasurementOrFact was made. Recommended best practice is to use an encoding scheme, such as ISO 8601:2004(E).
Notes: Further explanation of the International Standards Organization standard ISO 8601 can be found at http://en.wikipedia.org/wiki/ISO_8601.
Example(s): "1963-03-08T14:07-0600" is 8 Mar 1963 2:07pm in the time zone six hours earlier than UTC, "2009-02-20T08:40Z" is 20 Feb 2009 8:40am UTC, "1809-02-12" is 12 Feb 1809, "1906-06" is Jun 1906, "1971" is just that year, "2007-03-01T13:00:00Z/2008-05-11T15:30:00Z" is the interval between 1 Mar 2007 1pm UTC and 11 May 2008 3:30pm UTC, "2007-11-13/15" is the interval between 13 Nov 2007 and 15 Nov 2007.
Translations
Español (Spanish)
Fecha de la Determinación de la Medición: La fecha en que se realizó Medición o Hecho. La práctica recomendada es utilizar un esquema de codificación, como ISO 8601:2004 (E). |
Ejemplo: "1963-03-08T14:07-0600" es 8 de marzo de 1963 2:07pm en zona horaria seis horas más temprano que UTC, "2009-02-20T08:40Z" es 20 de febrero 2009 8:40am UTC, "1809-02-12" es 12 de febrero de 1809, "1906-06" es junio de 1906, "1971", "2007-03-01T13:00:00Z/2008-05-11T15:30:00Z" es el intervalo entre el 1 de marzo de 2007 1pm UTC y 11 de mayo de 2008 3:30pm UTC, "2007-11-13/15" es el intervalo entre el 13 de noviembre de 2007 y 15 de noviembre de 2007. |
中文(简体) (Simplified Chinese)
确定测量结果日期: 制定“测量或事实”的日期,建议最佳做法是使用一个编码方案,例如ISO 8601:2004(E)。 |
日本語 (Japanese)
Measurement Determined Date: MeasurementOrFactがなされた日付。ISO 8601:2004(E)などのスキーマの使用を推奨。 |